Type of work

Hydraulic works

Modernization of irrigation section III of the canal on the left area of Najerilla

Spain

  • Irrigation Section III of the Canal on the left bank of the Najerilla
  • Irrigation Section III of the Canal on the left bank of the Najerilla

Description

The works consisted of the modernization of the irrigation system to 9.17 hectares of farm land. The area is divided into three irrigation systems (La Mesa, La Cantera and La Zaballa) independent, formed by 828 groupings with their respective hydrants.

The purpose of the project is to improve and modernize irrigation to meet new internal regulations and adapting systems from manual to automated irrigation.