Type of work
Hydraulic works
Modernization of irrigation section III of the canal on the left area of Najerilla
Spain
Description
The works consisted of the modernization of the irrigation system to 9.17 hectares of farm land. The area is divided into three irrigation systems (La Mesa, La Cantera and La Zaballa) independent, formed by 828 groupings with their respective hydrants.
The purpose of the project is to improve and modernize irrigation to meet new internal regulations and adapting systems from manual to automated irrigation.