Type of work
Hydraulic works
Second main ring of distribution of drinking water in Madrid
Spain
18,770 m
total long
Description
The works consist of laying pipes to distribute pressurized water from the large reservoirs of Colmenar Viejo and Valmayor to the metropolitan demand zones of the capital and urban development areas located throughout the Madrid Community and surrounding areas.
The layout has a total pipe length of 18,770 meters.