Type of work
Railways
High speed line Madrid-Barcelona French border
Spain
202,9 km
of infrastructure executed
16,6 km
tunnel length
French border Madrid-Barcelona
French border Madrid-Barcelona
Description
- Length of infrastructure executed: 202.9 kilometers.
- Length of superstructure executed: 174.7 kilometers.
- Tunnels length: 16.6 kilometers.
- Total length of viaducts: 11.6 kilometers.
- Length of track assembly: 174.7 kilometers.
- Individual Projects: Civil and tracks of urban tunnels and Girona Station; Sub-sections II, IX-X and XIV of Madrid - Zaragoza; Ricla (execution of the longest tunnel on the entire line); Sub-section IVb of the Lleida-Martorell section; track assembly between Calatayud and Zaragoza.
Highlights
-
The works include the extension of the sub-ballast, expansion of the platform at L'Hospitales del Infant station, expansion of the platforms at the mouths of the Los Rojales tunnel, placement of acoustic screens and construction of two dual gauge changers.
Aspectos destacados
Las obras incluyen la extensión de subbalasto, ampliación de la plataforma en la estación de L'Hospitales del Infant, ampliación de las plataformas en las bocas del túnel Los Rojales, colocación de pantallas acústicas y construcción de dos cambiadores de anchos duales.