Type of work

Roads

A1 Motorway "Arad – Timisoara" Section

Romania

  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway
  • Arad – Timisoara Motorway

Description

The A1 motorway connects Bucharest with the Banat region, in the western part of the Romania. The motorway built by FCC is 32.25 kilometers long and runs between the towns of Timisoara and Arad, located in western Romania.

The 26 meters width includes four traffic lanes, two safety lanes and a central reservation. Thirty-one bridges and 13 transverse drainage structures were constructed to support such as; new service stations, which house the operations and maintenance buildings as well as a police station.

Type of work

Roads

Anillo Insular Tenerife

Spain

Construction of the new road section of the “Anillo Insular Tenerife”

Construction of the new road section of the “Anillo Insular Tenerife”

  • falso tunel anillo insular Tenerife
  • trayecto anillo insular Tenerife
  • ubicación bocas tuneles anillo insular Tenerife
  • boca norte anillo insular Tenerife
  • boca sur anillo insular Tenerife
  • falso tunel anillo insular Tenerife
  • trayecto anillo insular Tenerife
  • ubicación bocas tuneles anillo insular Tenerife
  • boca norte anillo insular Tenerife
  • boca sur anillo insular Tenerife

Description

The project involves the construction of the road section of the Anillo Insular Tenerife” between El Tanque and Santiago del Teide. This new stretch of road will be 11.3 kilometers long and will join the north and south corridors of the island of Tenerife.

The most critical part of the work is the construction of the Erjos tunnel. This build was completed with two parallel bores; each 5.1 kilometers in length. It will run under the “Macizo de Teno” becoming the longest tunnel in the island and one of the longest road tunnels in Spain.

Responsables

Se trata de una infraestructura fundamental para mejorar la movilidad y la conectividad entre el norte y el sur de la isla, así como para aliviar la congestión de tráfico de la autopista TF-5 en dirección a Santa Cruz de Tenerife.

Debido a la localización de las Charcas de Erjos, en el Parque Natural de Teno, sobre el terreno natural en las inmediaciones del trazado de los túneles, durante su excavación, se instalarán sismógrafos para la medida y seguimiento de las vibraciones minimizando la afección de la fauna y flora. 

Esta infraestructura de primer orden y sostenible posibilitará una reducción de emisiones de CO2 y protección del entorno medioambiental de la zona. 

Aspectos destacados

  • Comunicará las poblaciones de El Tanque y Santiago del Teide, dotando de una vía más segura y de mayor capacidad que la actual TF-82. 
  • Uno de los túneles más largos de España.
     

Type of work

Roads

By-pass Constanza

Romania

Design and execution of the Constanza Bypass

Design and execution of the Constanza Bypass

  • By-pass-de-Constanza_Incorporaciones
  • By-pass-de-Constanza_Paso-superior-sobre-autovía
  • By-pass-de-Constanza_Incorporaciones
  • By-pass-de-Constanza_Paso-superior-sobre-autovía

Description

FCC developed the design and construction of the Constanza by-pass, which is part of the Bucharest ring road network.

The highway is 22 kilometers long and is located west of the city of Constanza. It includes five links and 26 structures, including; six viaducts, six bridges, eight overpasses and six underpasses.

The project improved the flow of traffic and provided a connection with the A2 motorway by-pass towards Constanza.

Type of work

Roads

By-pass Usulután city

El Salvador

Construction of the by pass Usulatán City

Construction of the by pass Usulatán City

Description

The project entailed the construction 9.23 kilometers road in the municipalities of Usulután and Santa
María.

Type of work

Roads

Cantabrian Highway A-8

Spain

Cantabrian Highway A-8. Sectioon: Solares - La Encina

Cantabrian Highway A-8. Sectioon: Solares - La Encina

  • A-8. Tramo Solares La Encina_Inicio de Obra
  • A-8. Tramo Solares La Encina_Desmonte D-5
  • A-8. Tramo Solares La Encina_Enlace de Penagos (E-6)
  • A-8. Tramo Solares La Encina_Enlace de Sobremazas
  • A-8. Tramo Solares La Encina_Inicio de Obra
  • A-8. Tramo Solares La Encina_Desmonte D-5
  • A-8. Tramo Solares La Encina_Enlace de Penagos (E-6)
  • A-8. Tramo Solares La Encina_Enlace de Sobremazas

Description

FCC Construcción completed the Solares - La Encina (Cantabria) section of motorway. It has an approximate length of 13.3 kilometers and connects to the S-10 highway.

The overall excavation volume of approximately 4 million cubic meters were as a result of the; six vehicle flyovers, 13 highway underpasses, 31 retaining walls and containments, and a total of 28 transverse drainage operations.