Type of work
Railways
Zaragoza Tram
Spain
13.40 km
total long
24
stops
Description
It is a surface urban tram line that runs in a double or single track (depending on the sections) electrified, with all signalling and safety systems and with a segregated traffic platform in almost all its route, except for crossings.
Responsible
The project aims to meet all the transport needs of the city while respecting the environment, the urban landscape and the cultural heritage of Zaragoza.
Highlights
The total length is 13.40 kilometers, divided into two phases: phase 1 with a length of 5.96 kilometers and 10 stops and phase 2, which is developed later and covers a length of 7.44 kilometers and a total of 14 stops.