Type of work
Railways
Tram Baix-Llobregat
Spain
4.8 km
long
29
stops
Description
It is a key project for the linking of the Llobregat axis in Barcelona that consisted of the construction of a 14.8 kilometers tramway network, divided into a main axis and two branches, forming three lines (T1, T2 and T3), with a total of 29 stops.
The route is mostly considered as an electrified platform by means of a catenary and segregated from the rest of the road traffic.