Type of work
Railways
Murcia-Almería railway line
Spain
Description
- Length of civil infrastructure and superstructure: 46.97 kilometers.
- Tunnels length: 15.74 kilometers.
- Viaduct length: 5.14 kilometers. 16 viaducts stand out on the Nijar - Andarax River section (5 kilometers of viaducts).
- Individual projects: Alhama - Totana; Sorbas - Barranco de los Gafarillos; Totana - Lorca and Nijar - Andarax River. The Sorbas tunnel has become the longest in Andalusia.