Type of work
Railways
Zaragoza-Teruel railway line
Spain
Description
The project consisted of the line upgrading between the Villafranca del Campo abd Cella stations with a length of 27 kilometers.
It included the execution of a 66-meter viaduct as well as 13 overpasses and 3 underpasses, eliminating all level crossings.
Sagunto - Zaragoza line. Adaptation project for the railway line between Sagunto and Teruel for the circulation of 750 meters long freight trains.