Type of work

Railways

Zaragoza-Teruel railway line

Spain

  • Zaragoza-Teruel railway line
  • Zaragoza-Teruel railway line

Description

The project consisted of the line upgrading between the Villafranca del Campo abd Cella stations with a length of 27 kilometers.

It included the execution of a 66-meter viaduct as well as 13 overpasses and 3 underpasses,  eliminating all level crossings.

Sagunto - Zaragoza line. Adaptation project for the railway line between Sagunto and Teruel for the circulation of 750 meters long freight trains.