Type of work
Railways
Extension to the line 3 of Metro between Legazpi and Villaverde
Spain
8,704 m
long
Description
This is the first metro project in Madrid in which two TBMs begin working at the same point. The works are framed within the extension of Line 3 of the Madrid Metro with a total length of 8,704 meters.
The project also included the construction of 7 new stations, an interchange station and the reconstruction of the Legazpi station.