Type of work
Mining
Solid bulk terminal pier south Port of Castellon
Spain
500 m
dock
60.000 m²
platform
Construction of the superstructure and all the relevant facilities for its operation.
Construction of the superstructure and all the relevant facilities for its operation.
Description
The project entails construction of the solid bulk terminal, superstructure and all facilities relevant to its operation, including the office building, maintenance building and the warehouse.
The project also includes construction of a 500 meters dock, and a 60,000 squared meters platform for loading and unloading. The platform arrangement includes two 420 ton, 50 meters Gottwald-class cranes, each with 100 tons of lifting capacity.