Type of work
Roads
Vía Brasil Corridor
Panama
Description
It included the study, design, construction and financing of project.
- Section 1: It consisted of the transformation of the crossings traffic lights at one level, in crossings not trafficked to three levels, by building an overpass, a depressed underpass and a surface roundabout.
- Section 2: It consisted of the transformation of the crossings traffic lights at one level, in crossings not trafficked at two levels, by building an underpass and a roundabout on surface.