Type of work
Roads
Beach Corridor Section I
Panama
6
lanes
32.7 km
long
Description
FCC Construcción and the CICSA operator (division of infrastructure and construction of the Carso Group), execute the design, construction and subsequent maintenance of the extension of the first and second section of the Inter-American Highway (Panama).
Section I. Extension to six lanes of the Interamerican Highway between “Arraiján - La Chorrera”, connecting with the new road Pan American It has a length of 32.7 kilometers and includes the performance in two variants (Capira and Campana) which are they will adapt to the new dimensions of the road.