Type of work
Tunnels
Barcelona Metro Line 9
Spain
4,29 km
longitud
Section 4 Bon Pastor - Can Zam.
Section 4 Bon Pastor - Can Zam.
Description
The line connects the neighbourhood of Bon Pastor with Oliveres. Section 4 of line 9 of the Barcelona metro, was 4.29 kilometers, and was executed by tunnel boring machine. Construction was carried out with a TBM capable of working in open mode and closed (EPB).